PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Laying out block at the detention cells Facing West.jpg 1st floor sprinkler heads Facing North.jpg 2nd floor interior metal framing Facing North.jpg Installed door frame at the 1st floor sprinkler room Facing East.jpg Installed temporary pipe valve at the 4th floor Facing West.jpg Installing pipe hangers at the 1st floor Facing West.jpg Installing storm piping at the low roof Facing West.jpg Interior metal framing at the 2nd floor Facing north.jpg
Previous pageNext page Installed temporary pipe valve at the 4th floor Facing West
Installed temporary pipe valve at the 4th floor Facing West